Busy Week? Yes, Please!
So this week was action-packed, and it looks like next week is going to be even more so.
I've almost gotten the entire test server setup, with a few issues I'm looking into. I will say that when running a site where small to large files (3mb to 30mb) are being served, a 100mbps uplink speed makes a difference worth paying for. Especially if you plan to have more than a couple users utilizing files at the same time.
I ended up using the Apache, MySQL & PHP stack on Windows Server 2008 instead of IIS. Why? Because of our deadline and because when I start working with .Net I want to interrupt our primary web server as little as possible. I'm sure I could do that now, but like I said, deadline.
Next week I get to dig into the production server and don't foresee many issues there. Considering the speed of the machine, I expect a faster setup process than test.
Oh, that's right, our specs:
Our test server is a single cpu, Intel Xeon 3230-Quad Core [2.6GHz] with 4GB of DDR2 and 2 250GB sata drives in non-raid configuration.
Our production server is a dual cpu, Intel Xeon-Nehalem 5520-Quadcore [2.2GHz] with 12GB of DDR3 and 2 300GB SA-SCSI 15K RPM drives in raid1 configuration.
I can't wait for next week!
